Show I MEN RESUME WORK ON PIPE LINE THIS MORNING Although sixty good workmen were engaged engage all day ay yesterday In an to repair the water pipes pileS of the Utah Light Railway company In Olden so 50 that the lie water waler might ho he turned onto the tho great wheels of or ma mil at tho UIO compans plant at the mouth of the tho canyon tho the work was not ll t completed The rile men rested again last night but will resume operations again this morning at 30 It Is hoped i that the pipe pio will be bo repaired sum during durin thin the day ay to permit tho the turning aiming In of tho the water this even evening evenIng evening ing I |