OCR Text |
Show wf&et uim'j with WW i Aerial Spraying Contractors, Inc. 930 North Vernal Ave. Vernal, Utah 64078 X z1 (801) 789-7670 -fif CJ?. Bokkean, President : 3 X. J ,l ,1- L - l!-.-jv!K...y ' I ! . x: I V - ' VL " "i " 'I ' The map connected with this notice will show some corrections from the one in the paper three weeks ago. Those living next to these lines shown dark and heavy will be those needing to hook onto the lines. Any other area will be given notice in advance of the lines that will be constructed and the need to hook on. Sufficient notice will also be given in order to take advantage of the discount rate at that time. ! In connection with this map those living on the east side of the Kids Canal on 1500 West will not be required re-quired to hook on at this time because of canal problems. Also those on the East side of Hiway 40 going . through Naples from 500 South to 2500 South will not be required to connect at this time, except those adjacent ad-jacent to 500 South and 1500 South. This map shows only Ashley Valley Water and Sewer Improvement District. This does not apply to ' Maeser or Vernal City, although some lines on this map are joint owned and constructed. The policy of the District is not necessarily that of the other political areas of Vernal. Refer to the questions and answers in the paper three weeks ago for more specific information or call 789 5582 at the District's office. of-fice. ; Those along these lines considered residential will be given the opportunity to obtain the connection at t a discount rate of $1,000.00 until March 15, 1981, after that it will cost $1,500.00 until the construction ; I trench has passed the property and the road is repaired. From that time on the cost will be $2,000.00. 1 The cost for those properties classed as commercial properties the connection cost will be $2,000.00 ; plus an impact charge. After March 15, 1981, the cost will go to $4,000.00. The cost for those classed as Industrial Properties will be $3,000.00 plus Impact charge until March 15, j 1981, after that time the cost will go to $6,000.00. i( For those people that have vacant lots and wish to save some money by paying for additional hookups may pay the initial charge. These inactive connections will not be charged the monthly usage rate. The extra connections will have to be specifically located in order that the stub may be installed during construction. con-struction. If you have any further questions, please feel free to contact the office at 789-5582 or 85 S. 200 E. jj |