OCR Text |
Show CARDIFF ORE PILE IS BEING REDUCED The big ore pile of the Cardiff at the South Fork bins has been lessened considerably con-siderably during the past two or three weeks, and it is expected that the accumulation ac-cumulation will be entirely cleaned up by the time the road is open between the bins and the mine. When the trucks were put to work a few weeks ago there were about 1600 tons of ore at the South Fork bins. The platform plat-form has been cleared and it is estimated that there are about 600 tons of ore in the bins. According to latest word from the mine, the road between the mine and the bins lias been opened up about half way. It is expected that it will be passable in another two weeks. |