OCR Text |
Show CEMETERY CUES ARE REDUCED Bf ; THE CITY New schedules of charges for maintenance main-tenance service and construction work at tho Ogden City cemetery havo been announced by tho city commission, the municipality having taken over complete com-plete charge 'of all lota wit ha view of keeping them In good condition. For tho maintenance foe of $5 per year, the city assumes all responsibility responsibil-ity for care of tho lots, including installation in-stallation of hydrants, supply of hose and water, besides cutting of lawnB. The prices for cemont or concrete vaults have been reduced from $12.50 and 22 to $7.50 and $12. Graves are now dug for $2.60, $3.50 and $4.50. The chargo for building up lots, sowing to grass, building cop-inga cop-inga and cement walks about tho copings cop-ings has been placed at $35. |