OCR Text |
Show POWER PIPE LINE IN GOOD CONDITION BRIGHAM . CITY, May 1. Brigham City's power pipe line has just undergone a thorough inspection of Mayor J. W. Peters, City Manager C. O. Roskelley and members of the city council. The pipe line is built of wooden staves and has long been rumored to be in a dangerous condition on account of Its age. The matter mat-ter of rebuilding the entire line at enormous enor-mous cost has also been considered by former officials of the city, but the recent inspection reveT.Ied the pipe line to oe in an excellent Ktsia of preservation. With the exception of two or three places that need replacing, the officials declared upon their return that the pipe line will last as many more years as it has already given service. The line was installed about 1S92 and carried the water to the city powerhouse. |