Show City Installing Larger Pipe In Water System This week Parowan City is inaugurating in-augurating another phase of a program to rebuild its city culinary cul-inary water system on the pay-as-you go basis Inaugurated a year ago when the citizens voted vot-ed down a bond issue to rebuild the system under a one year program. pro-gram. This new project will be the purchase and laying of 6880 feet of new cast iron pipe in the city water lines. The pipe was brought In and distributed on the streets to receive new pipe several weeks ago. This week the old pipe will be taken up and the new pipe will be laid in Its place on the following streets: Seven hundred and forty-five feet of eight Inch pipe will be laid on Center Street from Main to 100 West Street From 100 West to 500 West 2000 feet of six-inch pipe will be laid to replace the smaller pipe in that line. Another 3000 feet of 4-inch pipe will be laid on two streets on the east side of the city. This pine will replace smaller pipe on 300 East from 200 South to 100 North and on 200 East from 200 South to 100 North. Already the "Ts" and Joints have been put in place on street Intersections included In the project pro-ject This week the new pipe will be laid with Parry and Sons Contracting Con-tracting Co. of Cedar City digging the trench and the city workmen laying the pipe. Another part of the project to be undertaken this time will bo the Installation of four additional addition-al fire hydrants of the larger type to connect onto the larger water line. They will replace the smaller hydrants. |