OCR Text |
Show Thursday evening when the demolition contractor set fire to the building remains after the walls had been caved in with power equipment. All the high school classes are now relocated and things Yellow Bldg. Down, Students Settle To New Routines It was with mixed emotions that faculty members and students, stu-dents, and many former students stu-dents of the Parowan High School, watched the destruction destruc-tion of the old yellow building build-ing during the past week. We thought we noticed a few tear stained faces among the large crowd which gathered on at the school are beginnig to settle down even though the past two weeks have been rather ra-ther hectic. It is reported that math instructor Claude Adams now conducts six classes each day in five different rooms, and has his own private office of-fice in the middle of the main front hall in the red building. But everyone, students and teachers alike, are looking to the future when the beautiful new building will be ready for occupancy, and promise to endure to the end. |