OCR Text |
Show STREET. WATER PROJECTS City Improvement Projects Near Completion Two important projects have been contracted by the City, one of them having been almost completed com-pleted and the other progressfng rapidly. One, a street Improvement pro-ject pro-ject providing a new bridge across what Is known as the Squaw Cave Wash on 500 East Street. Is practically complete. A large culvert type bridge, adequate ade-quate for carrying flood waters of the wash, and extending the surface of the bridge considerably, considerab-ly, Is almost complete. It Is located lo-cated on 400 South and 500 East ; Streets.. In addition a new culvert cul-vert to carry irrigation streams across the canal has also been Installed. The second project is an Improvement Im-provement In the culinary water system, designed to Improve service ser-vice to the East side of the city. A new and larger pipe line is being laid on Center Street from Main to 400 East Street. Trenching Trench-ing Is nearing completion and pipe Is being laid as the trench is completed, to avoid leaving open trenches' for a long period of time. |