OCR Text |
Show ADVERTISEMENT FOR BID Sealed BIDS for the construction of Schedule 6 of the Ashley Valley Wastewater Facilities will be received by the Ashley Valley Sewer Mangement Board at the Office of Uintah Engineering, 85 South 200 East, Vernal, Utah, until 7:00 p.m. (Mountain Standard Stan-dard Time) February 26, 1981, and then publicly opened and read aloud. Schedule 6 consists of the construction of 25,000 linear feet of 8" sewerline, 10,500 linear feet of 10" sewerline, manholes, surface repair and miscellaneous work. The CONTRACT DOCUMENTS, consisting of Advertisement for Bids, Information for Bidders, Bid-ders, Bid, Bid Bond, Agreement, General conditions, con-ditions, Supplemental to Proceed, Change Order Drawings, Specifications and Addenda, may be examined ex-amined at the following locations: Uintah Engineering, 85 South 200 East, Vernal, Utah Associated General Contractors of America, Salt Lake City, Utah Intermountain Contractor, Contrac-tor, Inc., Salt Lake City, Utah. Copies of the CONTRACT CON-TRACT DOCUMENTS may be obtained at the office of-fice of Uintah Engineering Engineer-ing located at 85 South 200 East (P.O. Box Q), Vernal, Ver-nal, Utah upon payment of $50.00 for each set. Any Bidder, upon returning retur-ning the CONTRACT DOCUMENTS promptly and in good condition, will be refunded his payment, and any non-bidder upon so returning the CONTRACT CON-TRACT DOCUMENTS will not receive a refund. NONDISCRIMINATION IN EMPLOYMENT Bidders of this work will be required to comply comp-ly with the President's Executive Order No.'s 11246 as amended, 11458, 11518, and 11625. The requirements re-quirements for bidders and contractors under these orders are explained explain-ed in the specifications. The following goals arid timetables for female utilization shall be includ-' includ-' ed in all federal and federally assisted construction con-struction contracts and subcontracts in excess of $10,000. The goals are applicable ap-plicable to the Contractor's Contrac-tor's aggregate on-site construction workforce whether or not part of that workforce is performing perfor-ming work on a federal or federally assisted contract con-tract of subcontract. AREA COVERED (Goals for Women Apply Nationwide) Timetable and Goals (percent): from April 1, 1978 until March 31, 1979 -3.1; from April 1, 1979 until un-til March 31, 1980 - 5.0; from April 1, 1980 until March 31, 1981 - 6.9. MINORITY BUSINESS ENTERPRISE UTILIZATION ' Bidders on this work will be required to comply comp-ly with Title 40 CFR 35.9360-7. The goals and other requirements for bidders and contractors under this regulation which concerns utilization utiliza-tion of minority business enterprises, are explained explain-ed in the specifications. RUSSELL M. VERNON Project engineer Uintah Engineering, Inc. Published in the Vernal Express Feb. 12 & 19, 1981. |