| OCR Text |
Show PLANS UNDER WAY FOR AUDITORIUM Plans are under way for the construction construc-tion of the new auditorium which is to be built to the rear of and adjoining the administration ad-ministration building of the University of Utah, according to W. W. Riter, president pres-ident of the board of regents. For this building, 575,000 was voted bv the last legislature. The auditorium wiil be equipped lor theatrical performances and other public functions, and will seat 2500 people. In architecture, the building will conform con-form to the style of the administration building. Young & Hansen are drawing the plans. Construction will be begun just as soon as the plans can be completed and the building contract let. |