OCR Text |
Show Basin traffic count on the increase Vehicle traffic volume was on the ( increase during January at three Uintah Basin stations and down at one, according to the Utah Department of Transportation Traffic Bulletin. Overall traffic throughout the state decreased 3.2 percent when compared with the corresponding month a year ago. Interstate travel on 1-80 at Parleys Canyon was down 12.2 percent compared com-pared with last year. U.S. 40 at Daniels Canyon showed an increase of 6.8 percent over last year. Traffic counting stations in the Basin compared with January last year indicated in-dicated a decrease of 2.2 percent on U-87 U-87 north of Duchesne. U.S. 40 west of Roosevelt showed an increase of 9.2 percent and U.S 40 east of Jensen was up by 14.5 percent. U-44 north of Vernal was reported at 10.4" percent above last year, according to the UDOT monthly report. |