OCR Text |
Show IRRIGATION PROJECT PLAN IS OUTLINED Ticking up the water of Green river fifteen miles by means of a dam 1,"0 feet hich if one of the constructive details onilinej in plans associated with a government gov-ernment recki mat ion project inaugurated with the application of ,1. L. Lytel. federal fed-eral project manager in t'tah. to George F, McConacle. state engineer, for a permit to conserve tin- waters of the Colorado river bay-in. thereby bringing about 4.00'J. -ooo acres of now iole land tinder cultivi-; cultivi-; ion. Mi"1, 000 acres of which lies in I'tah. Four thousand second-feet of water from the Green river is asked for, '.he i point of diversion to be ,"no feet south of the confluence of Coal creek and Green river. Ti version works arc to consist of a reinforced concrete dam, a headgatc and ci'.nal. with the necessary laterals and ditches. The main canal is to be 1 "0 miles lorn:', 1 t.' feet wide at the top and eighty feet wide at the bottom, to carry fifteen feet of water. |