OCR Text |
Show Dedication Hives for Alfamonf Elementary Dedication rites for the Alta-1 mont Elementary School will be i conducted November 7 at Alta- j mont. The services are scheduled i to begin at 7:30 p. m. I E. Allen Bateman, state super- j intendant of public instruction, will give the presentation address; Wm. ; N. Brotherson, Boneta, Duchesne County Legislature and president of the Moon Lake Stake of the Church of Jesus Christ of Latter- j day Saints, will give the dedicatory prayer. The building will be for-1 mally accepted by Doyle K. Swal- i low, school principal. ! The dedication program is under the direction of Theron Leavitt, I Roosevelt, president of the Du-i che.sne County Board of Education. I The rv.'blic is invited attend Hie (' i':-3"nn seiv'res. ?:3!C3 Supt. Eow?n C. Slutz. nera! program numbers will be presented by the e'emeniary school pup;'s. Special Guests Special guests at the dedication lites will include aU four former members of the Duchesne County Board of Education (only fou: former board members a,e stil! living former principals at Altamont, Alta-mont, mayors of the towns and cil;es in th3 county, the three Duchesne Du-chesne County Commissioners, Dr. P.. V. LaibOn. Roosevelt, member of the Utah State Board of Eduction. Construction was commenced in 1 (Continued on Eack Page) ALTAMONT SCHOOL . . . (Continued on Back Page) early October 1954, on the new building. The new building provides much, needed space and facilities and enabled the separation of the schools at Altamont into two separate sep-arate units elementary and secondary. sec-ondary. Dedication of the high school at Altamont, adjacent to the new elementary school, was conducted con-ducted in September. Overall cost for the elementary school project was $234,399.55, Supt. Stutz said. Cost apportionment apportion-ment is listed by the superintendent superinten-dent as $100,600.00 for new construction con-struction of 8,000 square feet of space; $67,754.60 for remodeling 17,551 square feet of existing building build-ing and $8,400.00 for cabinet work. This 25,551 feet of floor space affords room for 10 classrooms, a library, gymnasium for exclusive use by the elementary school, school lunch preparation center with adjacent dining room to serve both the elementary and high school, office suite, health examination exam-ination and sick room, and four toilets. Cannon and Mullen of Salt Lake were architects for the new building build-ing and remodeling project. |