OCR Text |
Show SH Kfevc Following is a summary of oil well drilling for the week ending Aug. 4, 1953, as released by the Scouting Division of Carter Car-ter Oil Co.: Elmer Moon No. 1 (Located at Antelope, SW'SE Sec. 8, 4S, 3W Total depth, 6571 ft. This well temporarily dropped on Feb. 11, 1953 as temporarily abandoned pending pulling of 7 in. casing. Casing salvaging, started July 27, now completed. Final plugging date: Aug. 1, 1953. Final report. Bamgerger Unit No. 1 (Located (Locat-ed at Walker Hollow, SW NW, Sec. 11, 7S 23 E Spudded Aug. 3, 1953. GE 5208 ft. Present Pres-ent total depth 539 ft., 13 in. hole, sand and shale. Preparing to run 1034 in. casing. Eyner Nielson Well No. 1 (Located (Lo-cated SE NW, Sec. 36, 3S, 5W Location and road completed. Location moved 218 ft. N and 285 ft. E of center SE NW Sec. 36, 3S, 5W. Working or rotary tools. |