OCR Text |
Show NOTICE TO CONTRACTORS Sealed proposals will be received re-ceived by the State Road Commission Com-mission of Utah, Room 60S, State Office Building, Salt Lake City, Utah until 2 o'clock p. m. Tuesday, Tues-day, January 26, 1965, and at that time publicly opened fof con-structiin con-structiin of a Butuminous Surfaced Surfac-ed Roadway and (3 Steel Structures Struc-tures over 20' span In Iron County, Coun-ty, the same being that section of Interstate No. 15 from Hamilton Fort to the South Limits of Cedar City identified as Federal Aid Project No. 1-15-2(7)52. The length of road to be constructed con-structed or improved Is 5.459 miles, and the principal items of work are approximately as follows: 60,455 Tons of Bituminous Bitumin-ous Surface Course, 9651,600 Cu. Yds. of Imported Borrow, 2503 Cu. Yds. of Class "A" Concrete (AE) and 286,500 Cu. Yds. of Unclassified Unclassi-fied Roadway Excavation. The project Is to be completed In 250 work! n 2 davs. Prequalif ication cf bidders is required. re-quired. Prior to any bidder's receiving re-ceiving plans and specifications, it will be necessary that the bidder bid-der have on file with the State Road Commission of Utah completed com-pleted and approved, the required requir-ed Prequalilicatlon Statement pertaining to contractor's experience experi-ence and financial condition. The attention of bidders is directed di-rected to the Special Provisions covering subletting or assigning the contract. In conformity with Section 115 of the Federal Aid Highway Act of 1956 the U. S. Department of Labor has certified the wape rates or this project which are the minimum wages to be paid on this project. These rates are made a part of tiie contract documents. The attention of bidders is di rected to the fact that this Commission Com-mission has been advised by the Wage and Hour Division, U.S. Department De-partment of Labor, that contractors contrac-tors engaged in highway construction con-struction work are required to meet the provisions of the Fair Labor Standards Act of 1938, (52 Stat. 1060). Proposed forms, plans, cross sections and specifications are on file in the office of the State Road Commission, Salt Lake City, and the office of its District Engineer En-gineer at Cedar City, Utah, where they may be reviewed by prospective prospec-tive bidders. Specifications, proposal pro-posal forms, and plans may be obtained at the Commission Offices Of-fices at Salt Lake City, upon application ap-plication and payment of a fee of $20.00, no part of which will be refunded. Each bidder must submit a letter from an approved surety company guaranteeing to furnish said bidder with required bond. The right to reject any or all bids is reserved. Cash, certified check, cashier's check, or approved proposal guarantee guar-antee bond for not less than five percent of total amount of bid made payable to the State Road , Commission must accompany each bid as evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish contract bond as required. Any additional information may be secured at the office of the State Road Commission. Dated this 2nd day of January, 1965. State Road Commission of Utah C. Taylor Burton, Director of Highways (Jan. 7, 1965). |