OCR Text |
Show tlon and completed, and the numerous big arc lights will be a feature In that 'part of the yards. "Over in tho shop gallery a force of men ls at work putting In shafting and arranging for the light machinery to be placed upstairs. The last section of the gallery is being closed up as fast as possible, and when the light machinery machin-ery has been placed In Its new posl- - tlon. the heavy machinery purchased for the first floor of the shop will go In where it belongs. The re-arrangement of the shop will be thorough and complete com-plete and will bring the plant up to where It belongs as one of the best on the By6tem." PLANT TO BE BEST IN SYSTEM RE-ARRANGEMENT OF S. P. SHOPS WILL BE THOROUGH. Viaduct Railing and Wlreworlc Already Here Big Structure Will Be Handsome. "We are closing up loose ends .as fast as possible on both the viaduct and the now gallery in the back shop of tho Southern Pacific machine shop , plant," said Engineer A. Q Campbell, to a Standard-Examiner reporter,' "and the next three week9 will see both jobs completed and off our hands. "The railing and wirework for tho viaduct is all here now and Contractor Dundas Is pushing tho work through as fast as possible. The wirework, new poles for electric lights, stairways and the like will give the big structure a handsome appearance when in posl- |