OCR Text |
Show I DOWN AT NEWHOUSE. Campaign Quickens Up to the Arrival 'of Structural Material. Two more carloads of structural Iron to be knitted into the huge plant with which the Newhouse mines out of Frisco, this State, are being equipped, were delivered at camp yesterday morning, as much more of this class of material Is now on Its way to New-house. New-house. Machinery is also arriving more freely, as is the lumber, and with the situation at this time the Messrs. Han-chett, Han-chett, Bettle and Dederlchs came In from the southern camp of copper yesterday yes-terday morning very much pleased. The three prodigious crushers, through which the ores are to be prepared for the plant, and that will be installed at the mouth of the tunnel, are now at camp, as are tho cranes, . the material for which latter three cars were required re-quired to handle, while lumber is piling up rapidly. The railroad between New-house New-house and the long tunnel was completed com-pleted last night, although two weeks will be required to perfect the ballast, while everything Is moving most satisfactorily. satis-factorily. Mr. Dederlchs, who is superintending su-perintending construction, is being freely free-ly congratulated on tho progress he Ik making, as Is also W. C. Thomas, who is exercising a general supervision, supervi-sion, and everything now indicates the completion of the big plant as schc- |