OCR Text |
Show INTENDED IMPRON EM EN IS The improvements to be constructed within said Special Improvement Improve-ment District in general include the excavation for and installation of sewer mains, collection lines, hookup T's with laterals', and all other miscellaneous work necessary to complete the work in a proper workmanlike manner. includes installation of hookup T's to sewer main or collection line and lateral from sewer main or collection line to line of property owner. It is intended that the above-referenced improvements im-provements be constructed con-structed in the following designated areas: " 1. 500 South Street: from 200 East to 500 West, both sides 2. 500 West Street: from 500 South to 1200 South, both sides 3. 1100 South Street: from 500 West, west to the present ending of the street (approximately 1100 West), both sides 4. 850 West Street: from 1 100 South, south and then west to the end of Hacienda Hacien-da Circle, both sides 5. 1200 South Street: from 500 West, west to the present ending of the street, both sides 6. 600 West Street: from 1100 South to 1200 South, both sides. |