OCR Text |
Show TINTIC STANDARD IS DRIVING SHAFT DEEPER II. G. Snyder, ono of the officials of the Tintic 'Standard Mining company, returned yesterday from Ttitic, whore he had been investigating tho property. Mr. Snyder is delighted with the present pres-ent condition of the mine, and reports-that reports-that tho work of drifting on the 225-foot 225-foot level is going ahead smoothly aud to tho satisfaction of tho management. Tn addition to this drifting in two different seclious, the company is sond-ing sond-ing tho main shaft down lo the 400-f-ot level, from which point additional drifts will bo sont out after the ores. "From every indication now apparent," ap-parent," said "Mr. Snj'dcr yesterday, ''we will encouutor the oro in. the shaft before wo gain tho 400-foot level. Wo have learned many things since our work on tho 225-fo'ot level started, and I am very much pleased with tho showings show-ings the 'mine now presents." The Tintic Standard company is being be-ing watched closely in local circles, for the work being dono is within tho heart of the Tintic excitement zone, and big results .on tho property are as logical as they wero on numerous groups surrounding sur-rounding it. Tho company is a Salt Lako organization. |