| OCR Text |
Show ISURVEY COMPLETED FOB BINGHAM TRAM A survey for the aerial tram with which It Is proposed to equip the properties prop-erties of the Bingham & New Haen Mining company in the great camp of copper was completed by the company's engineer on Sunday last, and estimates v illbe in the hands of President Stcxl-i Stcxl-i ardi who has been over the route with an expert tram-builder in the next few hours. While official announcement has not been made that a tramway will be constructed now appears quite conclu-lve conclu-lve At just what point on the rnll- ay connection -will be made has not been divulged, although It Is said the tramway will not be less than S000 feet in length. Meanwhile telephone connection con-nection with the mines is being estab-.vshed. estab-.vshed. while a steady tonnage of ore Is arriving at the valley furnaces'. With conditions at the youngster the management man-agement Is very much pleased, the main le vel continuing on ores with much unexplored un-explored territory ahead of It. |