OCR Text |
Show oo BAMBERGER ROAD TO CONNECT WITH OREM Salt Lake, March -20. Bids for the construction of tracks to connect tho present Bamberger station on Third West street, between South Temple and North Temple streets, with the new joint inlerurban terminal of the Salt Lake & Ogden and the Salt Lake & Utah railroads on First West street, between Second and Third South streets, wore called for yesterday by the Salt Lake & Ogden company. The materials included In the contract con-tract to be awarded to the successful bidder Include ties, rails, poles, wire and other construction material. The track will bo built from the present tracks on Third West street, east midway between North Temple and South Temple streets, by way ot Jennings avenue and through the center of tho First West-Second West street block to West Temple street; south on West Temple stroet to in front of the terminal Btation, half way between Second South and Third South streets on West Temple, and from that point turn east and run into tho block to tho front face of the tormlnal station. Tho first regular train of the Orem road will operate between Salt Lako and American Fork Monday. Tho train will leave the temporary Bta-tlon, Bta-tlon, at the corner of First West and Third South streetB, at 7:46 a. m. For tho present other trains will leave at 10:30 a. m., 1:30 p. m., and 5:30 p. m, The first train will leave American Fork for Salt Lako at 9:10 a. in. Other trains will leave at, 11:55 a. m., 2:55 p. m., and 6:55 p. m. |