OCR Text |
Show NOTICE TO CONTRACTORS Office of City Recorder, Cedar City, Utah Notice Is hereby given that Cedar City Corporation, Cedar City, Utah, hereinafter referred to as the "Owner" "Own-er" will receive bids up to 4 P. M. of the 5th day of November, 1347 for the award of contract for furnishing furn-ishing all labor and materials In connection with certain extension to its sanitary sewer system, located locat-ed within the Incorporated limits of Cedar City, Utah. Such bids will be received In the office of the City Recorder, located In the City Hall In said city and will be opened and publicly read aloud at the above time In the Court Room in said building. Each bid must conform and be responsive to this Invitation, the Information for Bidders, the Flans, Specifications, and all other Instruments Instru-ments comprising the pertinent Contract Con-tract Documents. Copies of the Contract Con-tract Documents are now on file and open to public inspection In the office of-fice of the City Engineer of Cedar City located In the City Hall at Cedar City, and at the offico of C. J. Ullrich, Consulting Engineer for aforesaid project, located at 422 Ness Bldg., Salt Lake City, Utah, and copies of plana and specifications may be obtained at either place by depositing $10.00 for each set. This deposit will be refunded if the plans and specifications are returned In good condition within 5 days after the date of bid opening. Each bid shall be made out on a bid form to be obtained at either of the offices mentioned above for obtaining plans and specifications. Each bid shall be accompanied by a certified or cashier's check payable pay-able to the Owner, or a satisfactory bid bond in favor of the Owner executed ex-ecuted by the Bidder as Principal and a satisfactory surety company as surety, In an amount not less than five percent of the maximum amount of the bid. The check or bid bond shall be given as a guarantee that the bidder shall execute the Contract Con-tract If It Is awarded to him In conformity with the Contract Documents Doc-uments and shall provide the surety bond as specified therein within five (5) days after notification of the award of the Contract to the bidder. The owner reserves the privilege of rejecting any and all bids or to waive any Irregularities or Informalities Inform-alities in any bid or in the bidding. No bidder may withdraw his bid for a period of 30 days after the date set for the opening of bids. By Order of Cedar City Council, Cedar City. Utah, By ELLEN A. SIMKIN3, Recorder. Date of first publication Oct. 9, 1947 Date of last publication Oct. 30, 194? |