OCR Text |
Show DAMAGE TO LIGHT COMPANY'S PLANT WAS VERY SERIOUS (Special to The Telegram. ) OGDEN, April 15. The damage to the pipe line of the Utah Light and Railway company In Ogden canyon is more serious seri-ous than at fire believed. It was announced this morning that over 200 feet of the line would have to be reconstructed. One hundred men are trying o repair the damage done, but the land continues to slide, and it Is feared that still greater damage will result. The local plant of the company has been closed down indefinitely. Ogden Is now receiving its light and power from the Elants of the company located near Salt ake and In the Bear river. |