OCR Text |
Show Plant Is Nearly Ready. OGDEN, Sept. 1. In preparation for a resumption of operations at the Twelfth street plant of the Utah Light & Railway Rail-way company, the headgates of the dam In Ogden canyon were closed on Saturday. Satur-day. Today it was reported that the water wa-ter above the dam had reached a depth of nearly twelvo feet ln the dredged reservoir. res-ervoir. Within the next few days the water will be turned into the pipe line and it will be possible to again generate current cur-rent at the local station. |