OCR Text |
Show I SURVEYORS ABE ! H4RD AT WORK Western Pacific Corps fat of City. Offices to Open Early in Week in News Block Annex. Meantime Organization Mu3t Still.Be Perfected nt the New York End of Line. "Western Pacific surveyors aro now working about six miles west of Gnr-f.cld Gnr-f.cld Two ramps arc plt led out there ami tho parties are running a line west from them. Resident Engineer Har-lov.e Har-lov.e has charge of the work. This strengthens the Impression that the Wbrlc In the Rio Grande yards will be pushed west by that road toward the site of the now smelters and that this track will be given over to the Western West-ern Pari lie. General Manager Rllg-way's Rllg-way's visit was fur the purpose, among other thinss, of seeing to this trackage track-age arrangement Meantime the Western Pacific offices in the Deseret News annex are practically practi-cally ready for occupancy now and the nrerlni; department of the road will move Into them the lirst of the week. The offices will be In charge of the engineering department, as will all work on the road, and there will be no general manager nor other official of that sort appointed. As a matter of fact, there still remains the organization organiza-tion of the road back In New York, a detail which 1 expected to be com-pleted com-pleted at any time. in the light of recent announcements from tho eastern end It would seem that news of arrangem.ntu for actual construction might he expected within a few weeks. Meantime the engineering engineer-ing parties are at work now on both ends of the line, which, by the way, has already been once surveyed. |