| OCR Text |
Show FINE WATER SERVICE FOR TOWN OF NEWHOUSE The work of extending the water, service from the main reservoir at Newhouse to the power plant and the various structures was begun on Monday Mon-day morning, when ditching was inaugurated. in-augurated. To perfect the service, 10.-600 10.-600 feet of pipe will be us.cd, the system sys-tem having at the townsile a pressure of sixty pounds. With which to fight the flames should vfhey start in any portion of the new town, a s3'stom of ilre-plugs will be established, the service ser-vice to be ready for the consumer as soon as active construction on the town Improvements shall begin. |