| Show SCHEME FAILED TO WORK AmerIcan Railway Clearing House About to Blow Up Chicago Chicag July American rail rall railway wa way clearing house which for eight months has been trying to a pool ot of all freight cars In the country Is In process of disintegration according to the Inter Ocean The Chicago o Alton rail railroad railroad road which was one of the strongest ad advocates advocates of the car pooling scheme at the outset will withdraw from It August I 1 IThe The Chicago Milwaukee St Paul road has alreadY withdrawn and many of the big roads In the east and west have de determined determined to abandon the project The organization has failed In Its prime object to Insure each road having on Its own rails all the time the number of cars owned by It ft It has failed to do this be because because cause It had no power to penalize the roads for disobeying Its mandates beyond the Imposition ot of the established rate of rental per diem |