Show 1 Shipment rom u Hn The first car load of high grade ore received from Austin NeT for sometime some-time past came in yesterday afternoon I after-noon and went to the sampler Its value was about the same as the other cars which have been shipped during the past year 5000 ThC shipments are made simply to furnish the cairn pany with sufficient ready money to continue the development work without with-out robbing the surplus Good progress i being made with the work ir the tunnel which is to develop all of the nineteen claims in the Union group and the last survey showed that the face is now in over 3000 feet from the mouth of the tunnel |