OCR Text |
Show PUIN CITY TO HAVE ICffllZEDffiQ ; si I Plain City, Jan. 11. About a mile of macadamized road is to be built in Plain City this winter. The shale for this purpose begins to arrhe this morning. It is being hauled from the crusher near the Hot Springs by team. bout twenty teams are employed. They are expected to deliver about 100 tons a day, each teams making j two trips. The road was graded and prepared I for the shale last fall. This improve-j improve-j ment will coer nearly all of the principal thoroughfare of the town, ' and. connection with the macadam road built last winter and the winter before, will give the district about J three miles of continuous macadam rnnd 'A |