Show Board Hears Report on Kolob Project A report in the engineering and surveying work completed to date on the Kolob Water Project and Crystal Creek Diversion was presented by project engineer Ralph B. Piatt at a meeting of the Cedar City Water Baord last week. Piatt proposed that two more test holes be drilled in the Crystal Creek to Kolob Diversion (tunnel) this summer. sum-mer. He said that rights of way and permits need to be obtained for work ' to be done on private property and that the title for the south portal of the tunnel in Hornet Canyon may be necessary to obtain for further exploration ex-ploration of the "portal entrance rock and alluvial conditions." The board accepted the resignation of former City Councilman Gordon Slack who cited "personal reasons" lor his decision. Newly appointed Chairman Joeseph Melling presided over the meeting. |