OCR Text |
Show ADVERTISEMENT T FOR BID Sealed BIDS for the construction of Schedule 4 of the Ashley Valley Wastewater Facilities will be received by the Ashley Valley Sewer Mangement Board at the Office of Uintah Engineering, 85 South 200 East, Vernal, Utah, until 7:00 p.m. (Mountain Standard Stan-dard Time) February 24, 1981, and then publicly opened and read aloud. Schedule 4 consists of the construction of 40,000 linear feet of 8" sewerline, 1,400 - linear feet of 12" sewerline, manholes, surface repair and miscellaneous work. The CONTRACT DOCUMENTS, consisting of Advertisement for Bids, Information for Bidders, Bid-ders, Bid, Bid Bond, Agreement, General conditions, con-ditions, Supplemental to Proceed, Change Order Drawings, Specifications and Addenda, may be examined ex-amined at the following locations: Uintah Engineering, 85 South 200 East, Vernal, Utah Associated General Contractors of America, Salt Lake City, Utah Intermountain Contractor, Contrac-tor, Inc., Salt Lake City, Utah. Copies of the CONTRACT CON-TRACT DOCUMENTS may be obtained at the office of-fice of Uintah Engineering Engineer-ing located at 85 South 200 East (P.O. Box Q), Vernal, Ver-nal, Utah upon payment of $50.00 for each set. Any Bidder, upon returning retur-ning the CONTRACT DOCUMENTS promptly and in good condition, will be refunded his payment, and any non-bidder upon ' so returning the CONTRACT CON-TRACT DOCUMENTS will not receive a refund. NONDISCRIMINATION IN EMPLOYMENT Bidders of this work will be required to comp-' comp-' ly with the President's Executive Order No.'s 11246 as amended, 11458, 11518, and 11625. The requirements re-quirements for bidders and contractors under these orders are explained explain-ed in the specifications. ' The following goals and timetables for female utilization shall be included includ-ed in all federal and federally assisted construction con-struction contracts and subcontracts in excess of $10,000. The goals are applicable ap-plicable to the Contractor's Contrac-tor's aggregate on-site construction workforce whether or not part of that workforce is perfor- ming work on a federal or federally assisted contract con-tract of subcontract. AREA COVERED (Goals for Women Apply Nationwide) Timetable and Goals (percent): from April 1, 1978 until March 31, 1979 -3.1; from April 1, 1979 until un-til March 31, 1980 - 5.0; from April 1, 1980 until March 31, 1981 - 6.9. MINORITY BUSINESS ENTERPRISE UTILIZATION Bidders on this work will be required to comply comp-ly with Title 40 CFR 35.9360-7. The goals and other requirements for bidders and contractors under this regulation which concerns utilization utiliza-tion of minority business enterprises, are explained explain-ed in the specifications. RUSSELL M. VERNON Project engineer Uintah Engineering, Inc. Published in the Vernal Express Feb. 12 & 19, 1981. |