OCR Text |
Show Bids On Meiv Hoosevelf Elementary School Set Board Will Call Bid Meeting Early During '56 Bids Tor new construction and remodeling to the Roosevelt Elementary Ele-mentary School likely will be called call-ed for during January or February, states Rowan C. Stutz, superintendent superin-tendent of schools for the Duchesne Du-chesne County School District. Architects for the Roosevelt Elementary El-ementary School project are Cannon Can-non & Mullen of Salt Lake City. The proiect calls for general re-i re-i pair and beautification of the old building. Under the remodeling part of the plans, space is provided provid-ed for a library upstairs, new administration ad-ministration suite, relocation of rest rooms. The presently-used stairway to the upper ssct:on of the building is to be removed, and another constructed in each new wing. Additional space will be provided pro-vided for a three class room wing at each end of the present building. build-ing. Total increase in class rooms is four, since some classroom space will" be utilized in the remodeling re-modeling project. New construction construc-tion will include a school lunch preparation center and a boiler 1 (Continued on Back Page) BrDS ON NEW SCHOOL . . . (Continued from Page 1) room at the rear of the gymnasium. gymnas-ium. The present gymnasium will be utilized as a multi-purpose room to be used as a gymnasium, auditorium, audi-torium, and dining area. Roll-away Roll-away tables will be set up for dining facilities. Two old buildings located on the campus are to be removed to provide more playground space. State allocation for the project is $253,606, Mr. Stutz said. |