OCR Text |
Show CM S1I11 TO 8E HEATED FOR IE WIRIER The foundations for the large inside pools at the Canyon sanitarium have been about completed, Manager Brig Robinson announced today. The pools arc to be 35 feet by 50 feet and 35 feet by 40 feet. It is expected the pools will be closed within two weeks and tvIII be ready for the public by the first week in October. Manager Robinson said fhat with the private baths already completed and the large outside pool, he expects to give the public all kinds of both-ing. both-ing. Thr. inside pools and dressing rooms arf to be heated by hot water and ihe tanitarium ktp' open all win-Ui. |