OCR Text |
Show Landscaping bids for SUSG opened in Salt Lake Bids for development and landscaping of the Southern Utah State College Mall and adjacent areas will be opened open-ed In Salt Lak.9 City Tuesday, it was announced by Merrill Kunz, controller of physical facilities and grounds at SUSC. SU-SC. Mr. Kunz said that the new project will complete the landscaping on the upper campus and will tie the upper and lower campus together. Included will be completion of landscaping around the Music Center and Student Center, With a compete Tenovation of the north-south pedestrian traffic area. Trees, shrubbery, and gardens gar-dens will be laid out to compliment com-pliment each of the existing buildings as well as to harmonize har-monize with established landscaping, land-scaping, Mr. Kunz said. He added that kiosks, benches, ben-ches, and decorative walkways walk-ways will make the mall an attractive center for campus activity. Landscaping and the slope areas will Include ponds and cascading waterfalls from the upper to the lower levels. The project will also involve in-volve landscaping around the new Administration Building, scheduled to ibe completed this spring. A 100-space parking park-ing area will be provided north of the building just off Center Street. Also to be improved im-proved is the parking area north of the Fieldhouse. |