OCR Text |
Show CONGRATULATIONS-The Utah Oil Refining Refin-ing company, construction supervisors. Inspectors In-spectors and contractors and the estimated 15,000 men employed on the Job deserve congratulations con-gratulations on the speedy completion of the oil pipe line from Fort Laramie, Wyo to Salt Lake City. The 438-mile line was completed In less -than three months over some of ihe most dllfl- cult terrain ever crossed by such a line. It was a record Job In which Salt Lake City takes a measure of pride along with the company and project workers. |