OCR Text |
Show BETTER ROAD, FOR THE" DEPOT ; . The driveways lor the use of the drays in the loading and unloading of good in local frame at the new Harrlnian freight dcpi? ate being rap-Idly rap-Idly put into shape. Tho roads will he constructed largely of macadam material and as an exldenee of their etiiciency In heavy hauling, a wagon carrying fifteen thousand pounds of green lumber was drawn over more than a block of one of the new roads this morning Wacom bearing loads of building material, weighing from four to five .tons, are hauled over tne new roads constantly. The macadamized wagon ways will extend for two blocks, or from Twenty-fifth street to Twenty-third Twenty-third street. The work on the freight dpot proper prop-er is going steadily along and. with the exception of the Interior of the office, of-fice, will be completed by tho rolddlo of next month. Wonunen are now engaged In placing the skylights and the mMjl awnings of the roof. Tho work of wlilug the depot, which was delayed by the absence of electrical material, is now being pushed toward completion as all of the necessary material ma-terial Is on hand. The brick work in I he office Is completed to the second sec-ond story and the masons are waiting for the cornice workers to finish sonic work at this point, after which the brick work will he carried to completion comple-tion without any further delay. |