OCR Text |
Show CITY INSTALLS NEW WATER PUMP TO ILP WATER SUPPLY A new electric pump has been installed at Bert Springs at the mouth of Hobble Creek canyon to facilitate culinary water pressure, pres-sure, it was reported this week. Since installation of the new pump, a marked improvement in the water pressure is noted. By the new device, the water is forced into the pipe under pressure pres-sure and by this means it is possible pos-sible to maintain a relatively high level of water af all times at the head house. Before installation of the pump, many homes on the east bench were without water during part of the day. This was the result of low pressure and also because m&ny townspeople were using water indiscriminately. When citizens use water out of jurn or more than is scheduled we pressure is reduced and inefficient in-efficient pressure makes it impossible im-possible to get water from faucets ouUying homes. This is a dangerous dan-gerous condition and very incon-jenent incon-jenent and can only be improved y constant compliance with the regulations, water officials point out. |