OCR Text |
Show CHIEF CONSOLIDATED BEGINS NEW RAISE During the past week a raise was started start-ed from the 1000 drift in the Chief Con-sojidatPd Con-sojidatPd mine for the purpose of hastening hasten-ing the completion of the No. 2 working shaft to that depth, says the Eureka Report Re-port er. The Chief's 1000 drift last Treek reached a point directly beneath the bottom of the new shaft, and by sinking and raisingworking rais-ingworking from botli ends it -will be but a short time until the new No. 2 shaft is completed down to the 1000 level With the shaft finished to that point, practically everything needed in the campaign cam-paign of work in the property of the Plu-tus Plu-tus company can be handled much more economically. |