OCR Text |
Show o LOCAL PLUMBER HAS LOWEST BID ON CAMP WILLIAMS WATER WORKS SYSTEM Nisls Fugal received word recently recent-ly tbat his bid on the Camp G. W. Williams water works system waa the lowest bid, and when approved by the government, work would begin be-gin at once. The system will Include a pumping pump-ing plant containing two pumps with a capacity of 450 gallons per minute from springs in the Jordan Narrows and the piping of the water through the camp. If the job Is awarded, work will begin at once. It Is a PWA job, and men will b selected from the lists of this group of workers. |