Show AT Till TilE STAY IA Ore Oro Ship Shipments melli Whim I Resumed Within Thirty lay layThe The Tho past palt thirty days daB have witnessed many changes chances at the May Do Da und tind within thirty days day more says Hunt ore Ire shipments shipment will vill be D that time the work of at cutting n a station In the tue tunnel for tor the engine will have been completed and a good start made on the new shaft The boilers and compressor are ret and will be started up In n a da day or two On Thursday the pump for tor hoisting the water was Installed and the low flow In the tho well has greatly Increased A ton tonoro ore oro house houle shaft house and blacksmith and carpenter Carprnter shop are about and the tunnel has been enlarged enlarge until It Is almost large enough to admit n a wagon drills will ho bv put to work In the new shaft hart and three shifts will hurry its lis connection with the ore are bodies With the small indebtedness entailed by the purchase of machinery wiped out the Ma May Day will 1 a series of at dividends that will make It n a most le In investment vestment Miner |