OCR Text |
Show i The Scouting Division of Carter Oil Co. has released the following bulletin on oil well drilling activities acti-vities for the week ending July 19, 1955: Whiterocks Unit No. 1 (Located NE NW WSE, Sec. 32, 2 N, 1 E) Preparing to spud. Minton-State No. 1 (Located NE SE, Sec. 32, 14 S, 20 E Set 16 inch casing at 1101 feet with 1700 sacks of cement, drilling at 1793 feet. SE SW NW, Sec. 20, 18S, 25E) Harley Bashor No. 1 (Located Drill stem test No. 1, 1310-1317 feet, tool open iy2 hours, shut in 30 minutes, recovered 5 feet of drilling fluid; Drill stem test No. 2, 1335-1363 feet, tool open 4 hours, shut in 30 minutes, recovered recover-ed 10 gallons of very slightly gas cut drilling fluid; Drill stem test No. 3, 1380-1428 feet, tool open 4 hours, shut in 30 minutes, recovered re-covered 130 feet of gas cut mud, and 650 feet of gas cut salt water; drilling at 1520 feet. |