OCR Text |
Show Advertisement for bids Owner: Pleasant we City. Address: 70 UOO East, Pleasant trove, Utah 84062. Separate sealed Bids I'" the Construction of feasant Grove City Minary Water System Movements - 1989 received by Pleas-t Pleas-t Grove City Corpo-n Corpo-n at the Pleasant e City Hall, 70 S. 11 East, Pleasant e, Utah until 11 MUST) Tuesday, , 1989, and then " said Office publicly edandread-aloud. "ie principal items at approxi- Clly as follows: SCHEDULE I -Ruction of a M.M gallon reser-"wi reser-"wi Piping and penances. The I project is to , ""Meted in 180 '''Nardays. ScHEDULE II . Construction of the reservoir supply pipeline pipe-line (2,500 l.f.) with fire hydrants, valves and appurtenances. The Schedule II project is to be completed in 90 calendar cal-endar days. The CONTRACT DOCUMENTS, consisting consist-ing of Advertisement for Bids, Information for Bidders, BID, BID BOND, Agreement, GENERAL CONDITIONS, CONDI-TIONS, SUPPLEMENTAL SUPPLEMEN-TAL GENERAL CONDITIONS, CON-DITIONS, Payment Bond, Performance Bond, NOTICE OF AWARD, NOTICE TO PROCEED, CHANGE ORDER, DRAWINGS, SPECIFICATIONS and ADDENDA may be examined at the following follow-ing locations: Horrocks Engineers, One West Main, American Ameri-can Fork, Utah 84003; Pleasant Grove City OfRres 70 South 100 East, Pleasant Grove, Utah 84062; Intermoun-tain Intermoun-tain Contractors, 1743 W. Alexander Street, Salt Lake City, Utah 84110. Copies of the CONTRACT CON-TRACT DOCUMENTS may be obtained at the office of Horrocks Engineers Engi-neers located at One West Main Street, American Fork, Utah 84003 upon payment of $35 for each set, none of which will be returned. re-turned. All BIDDERS are required to have payment pay-ment and performance bonds underwritten by a Surety Company approved by the U.S. Department ' of the Treasury (Circular 570, latest edition). David R. Holdaway Mayor "Published in the Pleasant Grove Review Aug. 30, Sept. 7 and 13, 1989. |