OCR Text |
Show force of men wcro put to work at that point today and dir. grade will be constructed con-structed as rapidly as possible. It Is estimated that the remaining portion of unfinished grade will be completed In about a week's time Track laying will begin Monday morning, an adequate supply of rails and ties having been received by tho company. TRACK LAYINC ON THE CANYON TROLLEY LINE Condemnation proceedings have , been Instituted by the Rapid Transit company for a right-of-way around the I big rock slide at the Lewis rlace In Ogden canyon. As yet no satisfac-' tory adjustment of the matter ot placing tho responsibility for the slide has been reached and it has been deemed advleable to settle it by a friendly suit in the courts. The blido, as measured by Engineer West, is 230 feet in length, 150 feet wide, and about 70 feet deep. Following the commencement of condemnation proceedings, a large |