OCR Text |
Show GRADING FOR A DOUBLE TRACK THREE HU DRED MEN AT WORK ON UNION PACIFIC.'' Eventually Entire Road in to Ogden WHI Be Double Tracked Storms Do Damage. Railroad men from Rawlins state that the work of double tracking the Union Pacific road between River and Wurmsutter, weat of Rawllns.has been resumed and nearly 300 men are em- i ployed thore at present. Part of the grading for the second track was done last fall, but a part of the work was subsequently washed out by floods and cloudbursts and this is now being be-ing rebuilt. As soon as the grade is in good condition aaln the 6teel. now pile d up at Wnrmsutter "will be laid and 1 the second track put In service for trains during the summer. This will make sixty miles of double-track double-track between Rawlins and Rock Springs, and It is generally predicted thill almost the entire division between be-tween Rawlini and Ogden will be double-tracke 1 within the next eighteen eigh-teen months or two years. |