OCR Text |
Show WORK OF B. & 0. DURISGPAST YEAR During the calendar year of 1904 the construction department of the Baltimore Balti-more & Ohio railroad has changed 29.35 miles of track, built S3.4 miles of new road and 86.35 miles of second track. This work Includes the construction of the Point Pleasant, Buckhannon & Ty-gert's Ty-gert's Valley railroad from Lemley Junction to Buckhannon, W. Va., a distance dis-tance of 12.6 miles; the second track between be-tween Newcastle junction and Strouth-ers, Strouth-ers, Pa., a distance of 14.2 miles; double track from Haselton to Nlles, O., a distance dis-tance of 8.5 miles; from Nlles, O., to Cuyahoga Falls, an entirely new double dou-ble track line has been built, a distance of 42.8 files, and changes of alignment and grades have been made and second track constructed from Flushing, O., to Falrpolnt O., s distance of 11.27 miles, and from Barton to Bridgeport, O., a distance of 9.15 miles. All of this work is practically completed, com-pleted, although some of it will not be in use before January 1. It has not yet been decided what construction con-struction work will be done during the next" year. |