OCR Text |
Show NOTICE TO CONTRACTORS. Sealed bids will be received by the board of trustees of Pocatello Independent Indepen-dent School District No. 1, at their office of-fice in the high school building, Pocatello, Poca-tello, Idaho, up until 8 p. m., August IS, 1919, for the erection and completion of two two-story and basement brick and concrete eight-room school buildings, one on east side location, and one on west side location, to be let in one contract. All bids shall be accompanied by a certified check to the amount of 5 per cent of the bid, which amount is to be forfeited to the school district as liquidated liqui-dated damages if the bidder shall fail or refuse, for a period of one week after the award of the work to him, to enter into a contract and furnish a bond, as hereinafter specified. No bids will be considered unless accompanied ac-companied by the above certified check. Plans .and specifications can be had by applying- to F. H. Paradice, Jr., archi- ; tect,. 219 Portneuf building, Pocatello, Idaho, and depositing $25. The same will be forfeited if the plans and specifications speci-fications are not returned with the bid. The successful bidder shall be required to sign a written contract covering the work to be done and materials to be furnished, fur-nished, and furnish a surety bond in an amount equal to 60 per cent of the bid; said contract and bond to be in such form as the board of trustees shall prescribe. pre-scribe. The board of trustees reserve the right to reject any or all bids. (Signed) ' S. S. FERGUSON, Clerk Board. bll39 |