| OCR Text |
Show SEWERAGE; BUFFALO, WYOMING. Notice to SeWer Contractors. Sealed proposals will bo received by the Mavor and Board of Trustees of the City of Buffalo. Wyoming, up to 8.00 o'clock p. m.. Mountain Time o tho 0th day of January, 1011. for furnishing all the materials and labor of air kinds necessary for the construction of a system sys-tem of sewerage in said city of Buffalo, Wyoming. All proposals mifst bo made on the blank forms which will bo furnished fur-nished for such purpose by the city: and must bo aocompanlcij by a certified check for $1000.00 drawn on some Buffalo. Wyoming, Wyo-ming, bank and made payable to thjj Treasurer of the City of Buffalo. Thero will be required about t390 linear feet of G-lnch pipe sewer: 11.5-10 linear feet of 8-lnch pipe sewor: 1910 linear feot of 10-lnch pipe sewer: -13-10 linear feet of 12-inch pipe sower: 700 linear feot of 15-inch pipe Fewer: each with necessary house connections: 51 manholes: 15 flush tanks; 22 lamp holes; outlets, and other appurtenances as may be needed. The minimum depth Is 5 feet, tho maximum depth is 18 feet, tho average depth Is 9 feet. Plans, specifications, blank form for proposal, and full instructions to bidders, may bo obtained upon application therefor there-for to Kayden "M. White, City Clerk of Buffalo. Wyoming, and the payment therefor of the sum of 5.00 as a guarantee guar-antee of good faith and to Insure their return In good order. E. L. CLARKE. Engineer in Charge. |