OCR Text |
Show NOTICE TO CONTRACTORS. .mL,CG ls h,reby Slven that sealed bids bc received by the undersigned up to L. noon. Friday, September 23, 1910. ror the materials and labor required in tho erection of a brick and concrete technical tech-nical high school building, nnd boiler house addition, to bo erected on tho Present high school grounds, for tho Salt 1 ,Ltllce, City Board of Education, "according i,?1! ns' specifications and drawings, janich aro opon for Inspection by tho bidders at the office of Cannon & Fetzer. architects, 606-507 Templeton building. Salt Lako City. Utah, and nil bids and proposals at tho above tlmo will be pub-Ucly pub-Ucly opened and rend In tho office of tho Board of Education in the City and ??iUIllX buI'dlng. Salt Lake City. Utah. All bids must be addressed to "Board of Education for Salt Lake City," and HiPi1 in lh0 lower lefthand corner. Bid for technical high school," or auch olds can bo delivered to tho Board of Education at tho nald tlmo and place of opening same. Bids must not contain conditions, qualifications, propositions, or any other things than those mentioned In plans, specifications, drawings, contracts and bonds, and bidder must use tho form of Ddf, which will do found at tho office of the said architects, and no other form of bid will bo received. A certified or cashier's check on somo bank In Salt-LaKe City, Utah, ror atj 1 least 5 per cent of tho amount of each bid must be inclosed. Each check Is to bo mado payable to tho undersigned, and Is to be forfeited to tho undernlgned in case tho bid is accepted and the bidder docs not enter into tho contract within six days after Its acceptance, for the faithful execution of the contract and bond hereinafter mentioned. The proposed contract and bond are also at tho office of said architects and can there be examined. 4 A bond must bo furnished for one-half one-half of tho bid. with good and sufficient sureties, all satisfactory to tho undersigned. under-signed. The bids aro lo bo for tho following work, and no subdivision will bo considered: con-sidered: For tho building complete, oxcent plumbing, heating and ventilating. For the plumbing, heating and ventilating. venti-lating. Thov undersigned reserves the right to reject any and nil bids. , BOARD OF EDUCATION. ' Of Salt Lake City, Utah. By L. P. Judd. Clork. . Daotei.alt L,akc clt-- Utah, Septom-oer Septom-oer 2. 1910. r264 |