OCR Text |
Show BINGHAM PROPERTIES RESUME 0PEBAT10HS Railroad Situation at Camp Is Improved, According to Report. Ac-ording to reports from Bingham, the situation In connection with trmpornrv suspension of operation at some of the properties in that camp, due to a breakdown break-down In the equipment of the Cnoper Plt railroad, was greatly Improved Mon-day, Mon-day, It was reported that with two engine?, en-gine?, one ,-,f which waa taken Sunday to the - amp from Salt Lake, the railroad was able to resume the transportation of orr from the mine? It !s understood that tho rjiiio.td company win put on addl llonal equipment as soon as possible Smelter Running Tull Blast. The Yampa smelter, helow the town, re-Bumed re-Bumed full Mast operations Monday after several days r.f reduced work, en account Of tho ncc,le,,t ,.11 the railroad With a llko amount of ,-,re that was transported Monday from the mines t- the smelter, the plant will he abl- to operate all fur-nnces, fur-nnces, according to tho reporta from the ca mo Will Rush Work. All the. excavation work in connection With the addition to h. made to the plant haa been completed, and the laying of the foundation for the new buildings will bo commenced at OnCO. Joseph Dederlchs, who Is In charge of the work, went to Bingham Monday, with a view of rushing the construction of the buildings a rapidly aa possible. |