OCR Text |
Show EE PJovg The following summary of oil well drilling activity for the week ending Dec. 7, 1954, has been released re-leased by the Scouting Division of Carter Oil Co.: Cedar Mesa, Unit No. 1 Drill stem test No. 4 straddle packer, 3040-3120 ft., could not get packer pack-er to hold. Wainting on cement at total depth of 5000 ft. Bluebell Unit No. 2 Ran drill stem test No. 20, 9562-9588 ft., straddle packer test. Tool open 4 hours, shut-in 30 minutes. Fair blow and recovered 1530 feet water wat-er cushion, and 2945 feet slightly mud-cut water. Drill stem test No. 21 straddle packer test of interval 7308-22 feet failed. Cleaned out hole and set 7 inch OD casing at 9560 feet. Total depth 9728 feet. Larson State No. 1 Road and location complete, soliciting contractors' bids. |